About two weeks back I figured
there was still hope to get some of the woodpile done, so with that in mind, I
set about with one goal in mind - move enough wood blocks to the splitting area
so that over the course of the winter I can split and stack them. I wanted to
do move 10 loads in the morning and 10 loads in the evening, but of course that
was being too ambitious, and I only managed 10 a day, but that seemed to be
enough. I now have about 3-4 cords of wood where I want it to be.
My big concern was that once the
snow arrived, I couldn’t really move the stuff with a wheelbarrow, it’s just
too slippery. Plus, the wood freezes into one big mound and I can’t really deal
with it until Spring. This is no longer a concern, and I’m now all set up to
start splitting. Now if I could just find the time.
Until the next time, thanks for
reading, and thanks to David Adams for the pic.
No comments:
Post a Comment