With KB seemingly out of the
picture, I spoke with a friend who is also a contractor, and he said he would
be interested in taking on the project. That is, of course, until he finds
greener pastures and ignores us, as well. He said up front that winter is a
tough time for him because he likes to snowboard (great), but at least he said
he’d be ready by spring to hit the ground running. Plus, he isn’t going to
snowboard every day, I think. If he could work a day or two a week, I’d be
satisfied, but we’ll see.
He also is a drywall guy, so he
can help with the vestibule, and said as much. He stopped by and had a look,
and his rate is reasonable because I think he’s sort of green, which is good
and bad. I’m all for green because it usually means he’s not a dictator and his
rates are usually lower. On the downside, green means that he doesn’t have as
much experience and is thus still learning.
Oh well, you can’t have it all.
Until the next time, thanks for reading, and thanks to Leifskandsen for the pic.
No comments:
Post a Comment